24/7 UK service desk · Sales Mon–Fri, 08:30–18:00 · Support 24/7/365
Leased lines, dark fibre, business broadband and SD-WAN procured across multiple carriers and managed as one estate. We stay carrier-agnostic so the right tail is chosen per site rather than per contract.
What you get
No asterisks. If something below is chargeable as an extra on your estate, it will be priced on the quote rather than discovered on the invoice.
10 Mbps to 10 Gbps dedicated bandwidth, uncontended, with symmetric throughput and a hard SLA on availability and fix time.
Unlit fibre between your own sites where volume or latency makes lit services uneconomic.
Application-aware routing across mixed transport, so voice takes the clean path and backups take the cheap one.
FTTP and FTTC for smaller sites, with 4G/5G backup where a second fixed tail is not viable.
Physically separate entry points and carrier paths, verified against duct records rather than assumed.
Latency, jitter, loss and utilisation polled continuously, with thresholds that raise a ticket before users do.
Four stages, each with something you keep at the end of it.
Every location is checked for existing tails, available carriers, lead times and any civils work hiding in the quote.
We price each site across our carrier panel and show you the comparison, including the excess construction charges.
Wayleaves, landlord consent, survey dates and installation slots are chased by us, weekly, until the circuit is live.
Circuit is tested to spec, documented, and added to monitoring before the first invoice is raised.
Not listed? Most platforms with a documented API can be integrated. Ask before you commit and we will confirm honestly rather than promise a roadmap.
Anonymised, because most clients would rather we did not name them. The numbers are real.
Operational technology separated onto its own VLAN and prioritised ahead of general office traffic.
Forty-two sites brought live on a rolling schedule with 5G backup at every location.
Dark fibre between two facilities where lit bandwidth costs had overtaken the cost of the fibre itself.
The four we are asked every time. More in the help centre.
Between 45 and 90 working days for most UK sites. The variable is almost always civils — new duct, road closures or landlord wayleaves. We flag likely excess construction charges at survey stage rather than three months in.
No. We hold agreements across several UK carriers and price each site independently. You see the comparison, including where a cheaper carrier has a worse fix-time SLA, and choose on the merits.
That your two circuits do not share a physical path, entry chamber or exchange. We verify this against carrier duct records before quoting. Where true diversity is not achievable at a site, we tell you and price a wireless or mobile alternative instead.
Yes. Existing circuits can be novated to us at contract break, or left with the incumbent and simply brought into our monitoring and support so you still get a single view of the estate.
Tell us what you run today and what is going wrong with it. We will come back with a design and a number, not a brochure.
Or call sales on +44 7777 173345 · Sales Mon–Fri, 08:30–18:00 · Support 24/7/365